Piping a water to air cooler means two circuits that must not mix, so the charge side and the water side are routed separately and labelled. Fudiesel runs the charge pipe as short as possible from the turbo to the core, then from the core to the throttle body, keeping bends gradual. The water circuit goes to a small radiator at the front, with the pump at the low point so it does not run dry, and a bleed at the highest point. Hoses are clipped at intervals so they cannot rub through. The two circuits are pressure tested separately before the engine is started. The water side is then bled with the pump running until no bubbles appear at the high point. Final specifications are subject to the written quotation or contract.